• Skip to main content
  • Skip to secondary navigation

David Pace, PhD, MBA

mostly fusion

  • CV
  • Research
  • Physics
  • Miscellany
  • Microblog
  • Connect

Microblog

June 29, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 54 of 320: cutting out the entry port of the particle beam so that we can install a bigger one. This should make maintenance easier. These photos show the outside and the inside view, with the outline to cut (see starter hole).

https://davidpace.com/1487-2/

Filed Under: Microblog

June 28, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 53 of 320: the new drift duct for the particle beam has completed Quality Assurance. Let’s put some power through it! ?‍? ?‍? (the red plastic cover, though it looks cool, is not part of the permanent installation)

https://davidpace.com/1484-2/

Filed Under: Microblog

June 27, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 52 of 320: the rejuvenating power of yesterday’s pizza carries us through today. The Control Room disassembly continues, with only a few desks remaining available for use. Full construction begins in July.

https://davidpace.com/1481-2/

Filed Under: Microblog

June 26, 2018 Leave a Comment

Bird in the Backyard  ?

https://davidpace.com/1477-2/

Filed Under: Microblog

June 26, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 51 of 320: today… my friends… is pizza party day! ?

https://davidpace.com/1475-2/

Filed Under: Microblog

June 25, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 50 of 320: touch-up welding on the newly installed duct that connects the new particle beam to the main chamber. About 5 MW of power passes through that duct, so let’s make sure it’s aligned properly ?

https://davidpace.com/1473-2/

Filed Under: Microblog

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 26
  • Page 27
  • Page 28
  • Page 29
  • Page 30
  • Interim pages omitted …
  • Page 48
  • Go to Next Page »

Copyright © 2026 · David Pace