• Skip to main content
  • Skip to secondary navigation

David Pace, PhD, MBA

mostly fusion

  • CV
  • Research
  • Physics
  • Miscellany
  • Microblog
  • Connect

Pace

June 22, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 47 of 320: patch panels provide a way to connect cables in the reactor pit to equipment located outside, i.e., they bring signals past the radiation shield. Today we remove some of these to make room for the new particle beam. ?‍? ?‍?

https://davidpace.com/1469-2/

Filed Under: Microblog

June 21, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 46 of 320: the laser tower MIT’s Laser Blow Off system at DIII-D. Diagnostic systems are getting a lot of love during the construction period.

https://davidpace.com/1460-2/

Filed Under: Microblog

June 20, 2018 Leave a Comment

He loves his new backyard! ? ?

https://davidpace.com/1456-2/

Filed Under: Microblog

June 20, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 45 of 320: removing the final component of the old particle beam. The blue stand is what used to hold the beam in place.

https://davidpace.com/1453-2/

Filed Under: Microblog

June 19, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 44 of 320: the control room is being emptied in preparation for renovation. Getting a new carpet seems like such a small change, but it’s going to be a big improvement.

https://davidpace.com/1449-2/

Filed Under: Microblog

June 12, 2018 Leave a Comment

Making Our Fusion Reactor Better, day 37 of 320: actually, I’m not sure what’s going on today because I’m moving to a new house ?

https://davidpace.com/1441-2/

Filed Under: Microblog

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 28
  • Page 29
  • Page 30
  • Page 31
  • Page 32
  • Interim pages omitted …
  • Page 59
  • Go to Next Page »

Copyright © 2026 · David Pace