Making Our Fusion Reactor Better, day 166 of 320: welding of the high strength steel begins! The frame rail (blue/silver with arc) is laid on top of the concrete base, but extends beyond it. Separate beams are visible beneath the frame rail, and now all must be welded together.
Leave a Reply